Date:    7-24-2010
Number of Hours:    1.00
Brief Description:    Tail Cone Attachment
Pg. 25-02
Step 3: Chamfered the edges of the Shoulder Strap Lugs.
Fabricated two aluminum bushings .259X.375X.375 from raw stock for use on Pg. 34-03 Step 1 ( installing canopy). I could not find the bushings or material so I reordered.