Date:    6-29-2010
Number of Hours:    3.00
Brief Description:    Empennage Faring
Pg. 12-09
Step 3: Removed the F-1294 Assy. Installed the Stab Assy. Clecoed the F-1294 Assy back in place.
Step 4: Tried to adjust the alignment of the F-1294 assy to get at least 1/8" clearance all around with the Stab Assy. Could not get the clearance, so the Stab Assy will need to be trimmed.
Step 5: Drilled the fairing on the right as in steps 1 & 2.
Step 6: With the four holes clecoed, drilled #40 the remaining holes marked on the masking tapes and clecoed.