| Date: |
6-15-2010 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Empennage Attachment |
|
|
Pg. 11-07 Step 8: Installed the Trim/Pitch Servo Assembly up between the Stabilator Skins to the AST Assembly Control Horns. Step 9: Installed the Servo Tray to the Attach Brackets. Installed hardware with exception of the cotter pins which will be used at final attackment. Step 10: Installed the rod end bearing to the AST Assy. Used a temporary bolt as I was out of AN3-10A bolts. |
||