| Date: |
4-9-2009 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Rr Spr, Stb Spr, Hng Brk Pg. 14-2 |
|
|
Deburred Hinge Brackets and Rear Spars Pg.14-2 Step 2: Machine Countersunk 120 degrees the Stub Spar Channels. Step 1: Clecoed the Stub Spar Doublers to the Stub Spar Channels. Step 3: Machine Countersunk 100 degrees the the inner hole of the Stub Spar Assys. Step 4: Riveted the Stub Spar Assys. with three flush rivets at the inboard end. |
||