| Date: |
4-29-2013 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Service Bulletin 12-11-09 |
|
|
SB12-11-09 Step 48: Removed supports under the fuselage. Step 49: Reinstalled the two most outboard cushion clamps on Center Section Assy. per Construction Manual Page 31-03. Step 50: Reconnected the Caliper Brake Lines to their fittings on the Inboard Main Gear Attach Brackets. Step 51: N/A. No brake fluid yet. Step 52: Reinstall Fuel Tank connected fuel lines to the tank. Bolted tank to the Baggage Bulkhead and using new frangible bolts to the Center Section. Step 53: N/A. No ELT installed yet. Step 54: N/A. No battery installed yet. Step 55: N/A. Not adding fuel yet. Step 56: Installed five inspection covers on the belly. Steps 57 thru 63 Not installed at this time. |
||