| Date: |
4-17-2016 |
|
| Number of Hours: |
16.00 |
|
| Brief Description: |
Final Prep and Flights |
|
|
Over the last two days, it has marked the final part of the process for the painting. Although there are a few areas still requiring correction on the paint work, it was necessary for me to get the aircraft in the air. I finished the rigging of all the control surfaces including checks on the balancing, had Dan Pearson do a secondary check of all the attachements and signed off the Logs for all of the material changes that have occured. I went for a short test flight to ensure that there were no issues associated with the handling and then it was onto the first flight with passengers in nearly 5 months. Andrew MacIntosh was kind enough to take Paul up and run next to us for some aerial shots. Listed below is a few of them. Thanks Ian, it is staggering what I have learned watching you and there are definitely a sequence of tasks necessary to get a good finish. Once this has occured, then comes the magic on corrections where needed. |
||