Date:    2-9-2014
Number of Hours:    2.00
Brief Description:    Glass and wiring beacon
Today was spent glassing the top fairing with the beacon in it and running the wire and creating the wire run supports thorugh the Vertical Stabiliser.

I used 5 minute epoxy for the wire mounts in the stabiliser. This should work fine, But that grommet in the centre rib was quite a challenge.

But with some long wire, and patience, I GOT THE SUCKER!!!!!!!