| Date: |
7-11-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Pitot and static systems |
|
|
Today I received almost al of the parts for the assembly of the static system. There were some parts missing, however, they are being sent post paid in a few days so no problems. I got to work to arrange the pitot and static components into the instruments and then cut the tubing to fit. I think that it is looking, OK, however the tube is very stiff and may need some 'persuasion' to sit comfortably. The only one I am having trouble with is the Altimeter as it has a push on fitting and as such with the tubing is hard to fit. I may need to try another option for this combining hard and soft tube. A little experimenting will be required here. |
||