| Date: |
1-3-2011 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Wiring |
|
|
Worked on wiring engine alternator circuits tonight. Installed battery isolation solenoid and wired to switch on panel. This is a continuous duty solenoid that breaks all power from the battery if a need arises. |
||