Date:    12-20-2009
Number of Hours:    3.00
Brief Description:    Oil Tank
Fab the 7E3-2R brackets to 7C3-1R top. Install hose clamp to 7F7-1SP upper channel. Drill and cleco. Install cork pad and rivet brackets. Install hose clamp.