| Date: |
5-25-2009 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Controls |
|
|
Attach 7C1-2 Bell Crank to 7C2-2 Torque Tube. I had the controls chrome plated at the local plate shop. then they did a "hydrogen bake" on all plated parts at the local heat treat shop to make sure I do not have brittleness. Install 7F6-3 Bearing and install control mount 7C3-1 into the plane. then started flap control linkage. |
||