Date:    2-22-2010
Number of Hours:    2.10
Brief Description:    Made final adjustments to trim tab.
Drilled folded ends of the inboard tabs. Removed from elevator. Set rivets. Riveted forward (elevator) half of E-721 to the elevator.

Installed and bended trim tab hinge pin.