| Date: |
1-24-2010 |
|
| Number of Hours: |
1.20 |
|
| Brief Description: |
Continued work on trim tab. |
|
|
Studied plans. Clamped E-721 to the top flange of E-607PP. Marked the inboard edge of E-619PP-1-020 and E-607PP on E-721. Drilled holes attaching E-619PP-1-020 to the bottom flange of E-607. Drilled holes attaching E-619PP-1-020 to the top flange of E-607PP and E-721. |
||