| Date: |
5-19-2020 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Install Fairing Nut Plates |
|
|
After the Iong process of drilling the initial fairing attach holes #40, then #30, I positionied and drilled the various nutplates, enlarged the holes to accept 8/32 machine screws(#19 bit). All were dimpled except along the wing walk top. Those were countersunk. Lots of work, but its done. |
||