Date:    5-14-2020
Number of Hours:    1.00
Brief Description:    Dynon Heated Pitot
Next was fitting the Dynon heated pitot/AOA into the safeair mast. Its a nice fit so next up will be drilling the attach holes into the pitot mast and into the Dynon pitot. Also, I'm looking for the optimal location to install the heated controller box. Found 2 possible locations. I'll sleep on it.