| Date: |
1-2-2015 |
|
| Number of Hours: |
9.00 |
|
| Brief Description: |
Elevator Assy. R/H final assembly |
|
|
1. Control fitting installed to R/H Elevator root rib with 4 ea. AN3 bolts and sef locking nuts as per DWG number 355M4 2. Corrugated conduit installed for Electric Pitch Trim actuator cables provisioning. 3. Final riveting of Elevator Assembly R/H performed acc. DWG number 355M4 except final installation of horn rib 355M4- 33 and tip fairing 355M4- 6 NOTE: Assembly completed without deviations. |
||