| Date: |
11-8-2014 |
|
| Number of Hours: |
12.00 |
|
| Brief Description: |
Elevator Assy. R/H pre-assembly |
|
|
1.Allocating all components and inspection for damages performed according PARTS LIST 355M4 Elevator Assy. R/H 2.Folowing the DWG 355M4 and instruction for assembly of the Elevator Assy. R/H internal and external structural components joined and drilled through the pilot holes for initial pre- assembly of the Aileron. 3. Final geometry check of R/H Elevator assembly performed. 4. All holes in the structural parts drilled to final diameter and deburred as per the drawing 355M4 |
||