| Date: |
4-18-2018 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
3 bids on lower wing for cowling hinge |
|
|
Had every thing sanded duct taped and resin on before the lower cowling was put into place for the 3 bids to be laid up onto the wing. |
||