| Date: |
11-12-2017 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
3 bids on upper wing for cowling hinge. |
|
|
The top wing was next to get ready for the hinge to hold the cowling into place. The top was ground and readied for the 3 bids for the hinge to attach too. I had the lay-up on a stick upside down and was pushed into placed and then flipped into position with great success. I used a mirror to see if it was in the right spot and very little movement was needed. This is to be done with the engine not in place. It is a bit harder to do the glass work but I am happy with the turn out. |
||