| Date: |
11-9-2017 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Cut cowling and 1 bids on outside |
|
|
I cut the cowling inline with the bottom wing to a flow in one direction. Everything and sanded and cleaned and micro added in the low areas and one bid with peel-ply added. I will trim when cured and the top wing needs the flange for the hinge next. Any time on the plane is good. Off to a slow start this winter. Still working for a living it takes money to make this bird fly. |
||