| Date: |
1-1-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
More heater work |
|
|
I primed the inside of the out flow, bolted on the down duct and all that good stuff. Then I had to finish up the pivot and scat tubing. I will be attaching the tubing with clamps to the bulk head when the order comes in from Aircraft spruce .. |
||