Date:    12-15-2012
Number of Hours:    3.00
Brief Description:    Bolted on heater and lay-upped the out flow
It was time to bolt the heater in place and prep the out flow duct for resin. Once the duct was done with micro-surrey I then did a 2 bid lay-up all around the outflow duct. I then used Dacron known as peel-ply to smooth out the edges.