| Date: |
12-15-2012 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Bolted on heater and lay-upped the out flow |
|
|
It was time to bolt the heater in place and prep the out flow duct for resin. Once the duct was done with micro-surrey I then did a 2 bid lay-up all around the outflow duct. I then used Dacron known as peel-ply to smooth out the edges. |
||