| Date: |
2-3-2013 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Hinge pockets |
|
|
Here I sanded the transition area from the inside plate to the door triax lay-ups so the rain water will flow out and down the weather stripping some day. I filled in the transition area with flox and resin. The doors are off one more time. I can see the doors being on and off a dozen more times before it is time to paint. |
||