| Date: |
1-6-2013 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Time to work on the latching system |
|
|
After the pilot door cooled off from the heating adjustment faze it was time to get the locking system in place. I spent time viewing the DVD’s that came with the kit and read the manual a few times to get things right. This was fun!! I structurally attached the base for the handle and looked into the resin cabinet thinking of the fun when I play with the resin. I think I’m becoming a resin junkie and will need a fix soon on some kid of lay-up. |
||