| Date: |
4-17-2019 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Static port made and installed. |
|
|
As to the manual, aluminum tube bent and sanded, fuselage cut and foam removed, Spot-lite bondo used to hold in place, micro and 2 bids to seal the deal. Drilled 3 holes and plugged from inside with 5 minute epoxy and milled fiber, peel-ply added to have a smooth surface and to stop sagging down. The holes were cleaned up on the outside. One more thing off the list. 2,000 to go |
||