Date:    5-18-2017
Number of Hours:    3.00
Brief Description:    Work on installing nose gear micro switch
I started this job by bending the aluminum tab to mount the micro switch drilled and slotted for adjustment. I then placed and drilled for mounting. Flox and structural adhesive was next. The switch was wired and ready for the job.