Date:    11-21-2016
Number of Hours:    3.00
Brief Description:    Installed avionics shelf.
I got things marked out and drilled holes and clecoed the brackets in place for the other holes to be drilled. The blind nuts were installed next and the Co-pilot side screwed into place. I have just enough room to get this into place with one bracket attached. I have ¼” clearance on both sides and I’m happy with that. The tray was positioned and 2 clecos in to hold over night.
The new jacks are great for leveling the fuselage so I could get this done correctly.