10-5-2016 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Worked on spindles, brackets, foam reinforcement o |
|
|
I adjusted the spindles so there is only 2 degrees off from the vertical line with no load. I have now idea if this is right at this point so I will ask the VOBA group if I’m in the ball park. I then lifted the landing gear by hand and found a few spots that needed sanding for clearance with the new blocks on the end of the gear legs. I cut out the brackets that hold the doors on at the spindle with the plasma cutter. It did work well but I need to change to 240 volts to get all I can out of it. I then cut foam and microed onto the doors and added 2 bids to stiffen the center section. |
||