| Date: |
9-30-2016 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
More bid work in the gear leg socket area. |
|
|
I removed the legs and used the electric hack saw to make the opening bigger so the legs go in and out easier. There is a peace of foam with TRAX on both side’s above the ear leg bolts and I cut off ¾” in height to have the legs go in and out with out scratching the primer and some day the paint. I will add 2 bids for strength for the removal of foam and glass. The electric hack saw is amazing I wish I had got this in the first place and not the air saw. Someone on VOBA had mentioned this saw from Harbor freight so it was a must to get. |
||