Date:    7-4-2015
Number of Hours:    4.00
Brief Description:    Fill and sanding on the control surfaces
It was a fill and sand day on the control surfaces. The shop is 25 Celsius 76 degrees so the bondo set up very fast. I have to clean the tools every time the stuff times out or I use what has been mixed.
Good results and it should take only 8 hours to get to a primer paint state.