Date:    3-31-2014
Number of Hours:    5.00
Brief Description:    Sanding and prep for top of flanges
I got every thing sanded today for the top to go on the flanges. This is to add strength and fill in on the foam baffle heads. I started on the sight gages and read up on the electric gages to day.
Andy Millin show’s how he did it and I will go with the same system that Andy used.
Thanks to Andy’s web site on a lot of things.