| Date: |
3-14-2014 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Fuel line and back, outside bulkhead 2 bids |
|
|
I started with microing in the fuel line with 2 bids on top. Then it was time for the back fuel bulkhead so I bonded in place with the outside one also. Got more micro mixed up and did the radius followed with 2 bids and peel-ply. Another good work night on the plane and now Cynthia time. |
||