| Date: |
3-8-2014 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Second layer of bid cloth on bulkheads |
|
|
The manual calls for one more bidirectional cloth be lay-upped on the bulkheads to help with the fuel proofing. I sanded the bulkheads and added micro in any low spots to avoid air bubbles under the glass. I then painted the bulkheads and laid down the cloth and stippled until wetted out. After 30 minuets I applied peel-ply with the heat gun for the resin to soaked trough. I did have to add some resin to the peel-ply to wet out completely a few dips of the brush was all that was needed. |
||