| Date: |
2-1-2014 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Grooved out bulkheads and baffles. Add resin to st |
|
|
I grooved out all the bulkheads and baffles for the micro to go on with 1 bib on top. I then sanded every thing for the fuel proofing vacuumed up the cuttings and wiped down with acetone. The stake was ready for resin now. |
||