Date:    12-24-2013
Number of Hours:    1.50
Brief Description:    Cut bid for baffles and bulkheads
It was time to cut the bid cloth for the baffles and bulkheads. The tops of the bulkheads and baffles will also have a landing added for a better sealing when the top strake goes on.