Date:    12-23-2013
Number of Hours:    3.50
Brief Description:    Bid in leg cover and added to wheel well
It was time to bid in the leg cover with the finger radius and peel-ply.
The gear wheel well had to added too so that there was the ½” clearance as stated in the manual.