| Date: |
12-23-2013 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Bid in leg cover and added to wheel well |
|
|
It was time to bid in the leg cover with the finger radius and peel-ply. The gear wheel well had to added too so that there was the ½” clearance as stated in the manual. |
||