| Date: |
5-11-2013 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Milled fiber in hard points with 3 bid |
|
|
Saturday morning I mixed up milled fiber and resin and installed all the hard points. I then did a 3 bid lay-up on all the points. Next was peel-ply on all the hard points. When I pressed the hard points into place the center hole had resin ooze out and that had to be removed. I a few days I will re-drill the 3/8” hole and tap for the 7/16” fine thread bolts. |
||