| Date: |
11-4-2012 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Gear sockets |
|
|
The landing rear had duck tape put on length wise and 3 TRIAX wet out and put on top of the duck tape to cure and be used as a socket latter on in the construction |
||