| Date: |
8-19-2011 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Match Drilling the Left Aft Spar |
|
|
Image 1 shows the left mid-span Aileron Doubler clecoed in place so I can mark up where to cut the relief hole for the aileron control pushrod. Image 2 shows me match drilling the left outboard Aileron Doubler using two of my cleco jars to help hold the z-section upright. Image 3 shows me match drilling the left Aft Spar Aileron Gap Seal. |
||