| Date: |
8-19-2011 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Match Drilling the Aft Spar |
|
|
After I finished match drilling all of the right Aft Spar components it was time for deburring (Image 1). Then I moved onto match drilling the left Aft Spar. Image 2 shows me match drilling the left Aft Spar doublers. Image 3 shows me match drilling the left Aft Spar mid-span Aileron Doubler. |
||