| Date: |
8-14-2011 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Working on the Aft Spar |
|
|
Image 1 shows me match drilling the mid-span Aileron Doubler. The Doubler was located by measuring from the outboard edge. Image 2 shows the mid-span Aileron Doubler still clamped in place after match drilling. Image 3 shows the outboard Aileron Doubler clamped in place ready for match drilling. |
||