Date:    8-14-2011
Number of Hours:    2.50
Brief Description:    Working on the Aft Spar
Image 1 shows me match drilling the mid-span Aileron Doubler. The Doubler was located by measuring from the outboard edge. Image 2 shows the mid-span Aileron Doubler still clamped in place after match drilling. Image 3 shows the outboard Aileron Doubler clamped in place ready for match drilling.