| Date: |
6-25-2011 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Preparing for Landing Lights |
|
|
Images 1 and 2 show me match drilling the lower leading edge surface to the Landing Light frame. Note in Image 2 that as I move accross the frame I immediately put a cleco in the drilled hole (from the inside so it's easier to drill) to keep the frame in place. Image 3 shows that no matter how many holes you drill, you're not done until you deburr each hole. |
||