| Date: |
2-13-2011 |
|
| Number of Hours: |
1.25 |
|
| Brief Description: |
Preparing for Landing Lights |
|
|
Image 1 shows the Landing Light Frame Shims held in place by the side jaw clamps ready for match drilling. Image 2 shows me match drilling the frame to the leading edge and Image 3 shows the leading edge shims clecoed to the leading edge skin. |
||