Date:    6-7-2009
Number of Hours:    2.00
Brief Description:    Assembling the Elevators
Started assembling the Left Elevator, begining with the Trim Tab. The control horn was riveted on using flush-head rivets and my pneumatic squeezer. The skeleton was assembled using the pneumatic squeezer too.