| Date: |
6-7-2009 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Assembling the Elevators |
|
|
Started assembling the Left Elevator, begining with the Trim Tab. The control horn was riveted on using flush-head rivets and my pneumatic squeezer. The skeleton was assembled using the pneumatic squeezer too. |
||