Date:    10-31-2008
Number of Hours:    3.00
Brief Description:    Preparing the Right Elevator
Clecoed the Right Hand Elevator assembly together and started drilling the assembly. Image 1 shows the skin and stiffeners being match drilled. Image 2 shows the Right Elevator Lead Counterbalance Weiight being match drilled. Image 3 shows the Right Elevator Control Horn being match drilled.