| Date: |
10-5-2008 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Riveting the Vertical Stabilizer |
|
|
Riveting the Vertical Stabilizer skeleton in preparation for riveting the Vertical Stabilizer. Image 1 shows the middle nose rib being riveted to the Forward Spar. Image 2 shows the top rib being riveted to the forward spar. Image 3 shows the Vertical Stabilizer sikin being dimpled with the DRDT-2 dimpler. |
||