| Date: |
10-4-2008 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Riveting the Vertical Stabilizer |
|
|
Now assembling the Vertical Stabilizer. In Images 1 thru 3 I'm using my pneumatic rivet squeezer to rivet the VS-803PP Aft Spar to the VS-808PP Aft Spar Doubler. The hinge brackets were also riveted in place at the same time. |
||