| Date: |
1-25-2008 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Drilling the Vertical Stabilizer |
|
|
Disassembled Vertical Stabilizer sturcture and deburred all matching holes and cleared chips. Then re-Cleco'd the Vertical Stabilizer structure together and cleco'd the VS-801PP skin in place in preparation for match drilling the skin to the structure. |
||