Date:    1-25-2008
Number of Hours:    1.00
Brief Description:    Drilling the Vertical Stabilizer
Disassembled Vertical Stabilizer sturcture and deburred all matching holes and cleared chips. Then re-Cleco'd the Vertical Stabilizer structure together and cleco'd the VS-801PP skin in place in preparation for match drilling the skin to the structure.