Date:    1-20-2008
Number of Hours:    2.00
Brief Description:    Drilling the Vertical Stabilizer
Prepared the VS-704 Root Rib, VS-705 Nose Rib, VS-706 Tip Rib and VS-707 Rib for assembly by fluting/straightening and deburring and then cleco'd together. Matched drilled the ribs to Spars.