| Date: |
1-20-2008 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Drilling the Vertical Stabilizer |
|
|
Prepared the VS-704 Root Rib, VS-705 Nose Rib, VS-706 Tip Rib and VS-707 Rib for assembly by fluting/straightening and deburring and then cleco'd together. Matched drilled the ribs to Spars. |
||