Date:    1-1-2008
Number of Hours:    2.00
Brief Description:    Drilling the Vertical Stabilizer
Cleco'd the VS-808PP Spar Doubler to the VS-803PP Rear Spar then cleco'd on the VS-410PP, VS-411PP, and VS-412PP hinge brackets. Drilled all holes in the Spar, Spar Doubler and hinge brackets. Disassembled and deburred all parts.